Building Fund


Construction progress and architectural rendering

Construction of Building No. 4 has been stalled at the ceiling level of the first floor since 2014. In the meantime, growing enrollment has resulted in crowded classrooms and in classes overflowing into both the dormitory and the library. This has rendered the dormitory severely overcrowded and the library inaccessible to other classes at certain times.

In Ghana, construction must be completed on a pay-as-you-go basis because there’s no such thing as a construction loan. $300,000 is needed to complete the building to provide much-needed classroom space.

$300,000
needed to complete the building